Introduction This paper will be an in depth critical review of “Project Management in the Automotive Industry” by Cristophe Midler and Christian Navarre. Their paper talks about how automotive project management has developed after World War II. It mentions how the Japanese made an impact on the Western Automotive Market and brought about the beginnings of an actual project manager. It mentions how it brought about lasting changes in corporate structures, the relationship amongst OEMs and their suppliers. It also discusses the importance of project management when dealing with a large number of differentiated products.

Need a custom essay on the same topic?
Give us your paper requirements, choose a writer and we’ll deliver the highest-quality essay!
Order now

They’ve discussed this four phases which start after the war. This work will include a brief summary of their work followed by a review of the data provided that explains the different phases which is then followed by the things that could have possibly made their paper more concise and complete. Note that several other academic material related to the topic have also been taken in consideration for this critical analysis. Summary Phase I The period immediately after the saw no big difference between the strategies of American and European carmakers. Project management was never a major focus in their manufacturing and research endeavors. This period was characterized by a small number of models with minimal diversity which were meant to be long lasting. Major expenses were reduced by mass production.

These cars were designed by so called project crafts which were focused on trade and only the top tier had any say on changes that were to be made. This was because the various departments had zero communication between them and reported to the top directly. The major issues were addressed only within the projects. This made the risk assessment easier and clearer. However, the level of performance was considerably low and product development took several years. The longer lead times only made it worse. It took many months to reach nominal production rates, much like the issue that Tesla is facing at the moment. A large number products failed to capture the market even though the competition was almost non-existing. Phase II The period between the 70s and 80s saw a rise in competition which brought about the saturation of the automotive market. Project management now became more of a competitive advantage rather than a luxury. As modes vehicles more diverse and variety of vehicles started rolling out. Carmakers wanted to look toward a global market. The older so called project craft was proving ineffective if handling the task at hand. This lead to the beginning of actual project management in professional terms. This involved the overlooking and guiding a project until completion within a specific timeline, the various economic trends that could possibly affect the project were taken into account. However, there was no actual change to bring about a relationship between the various departments other than centralizing control. This gave the project management team close to no power to back their logic against the technical teams. Though light weight project management did bring about a few improvements, the limits became evident soon enough. There was no one on the inside who has enough control and power to manage the possible risks and improve initial product quality.

However, the Japanese Automakers were the ones that brought about an innovative change to the system. Their ideas could possibly flush out their entire competition as they could rapidly bring new products to market. This was the major reason for their success in North America. The Japanese had a wide variety of vehicles to offer which were way more recent and advanced than their American counterparts. Such a strategy can only thank efficient project management for its execution. It concentrated on reducing lead times and making the project teams more productive, this immediately impacted the quality of vehicles made. This lead to a new way of project management in the following years. Phase III By the end of the 80s the concept of concurrent engineering saw the light of day which lead to a massive rise in the implementation of project management. This resulted in the appointment of project directors. They were the epitome of the heavy weight project manager’s structure. The Japanese coined them as Susha. The Susha has control over the entire scope of a project. Chrysler was the first to bring this to the United States. Chrysler which was in state of bankruptcy due to a weak brand identity and the failure of their corporate structure needed a new management to redefine their product range. Their products were divided into five platforms: Small cars, Jeeps, Trucks and Minivans. Their workforce was split up and one person was designated to lead each team and cooperate with the other teams. The last phase which had just one person pulling the strings and causing the chaos this brought about increased costs and a lack of accountability and solidarity. This hindered the success of the project. The new system however encouraged people to take responsibility as the project directors made their teams more focused on quality, cost and duration. The rules of the game had changed and it was more team based than ever. The first change was timing based. This involved the anticipation of problems by using early prototypes and check feasibility. The second change was on the communication between the various departments. The top tier was no longer the only playmaker.

The project teams made sure that lower levels had a fair share to voice their concerns. The final change was the spatial reorganization of work, the teams were put together in offices. Chrysler built their own development center which promoted communication among its workforce. The previously independent teams started working in unison to address the project’s issues. This made concurrent product development possible through simultaneous engineering. This new trend however was detrimental in terms of capitalization, hence the major problem was implementing them without causing a negative effect on trade. To counter this the OEMs set up expert clubs to promote technical skills under a general manager. Projects now became more than just something the OEMs worked on by themselves. Their suppliers were now more than mere contributors. They were now a part of the development process itself. They became regular participants in progress meetings and provided input that best suits the overall development. Projects now became a more professional process, the major concern is maintain connections between the management and technical teams. The greater the strategic standing of an organization the heavier will be the function of the management teams. This phase led to the spectacular rise of Western carmakers, they had finally caught up with their Japanese counterparts. Lead times had been reduced significantly. However the 90s didn’t end so well. The end of the millennium saw that these strategies couldn’t quite keep up. The new product development strategy didn’t necessarily reap in the profits. Phase IV As the new century was closing in the competition became more innovation based with rapid development in technologies. The advantages these companies had was soon lost as competitors soon started using their best practices make it a tied game. To best their competition carmakers started making radical innovations which were accompanied with higher risk but the bigger concern was the fact the project directors were not good enough to handle such tasks. Radical innovation required that the companies address and control learning features of new technologies. The heavyweight project management template worked well only when such projects had lower volumes of production. The Japanese found that their Susha system was dealing with too many departments and coordinating a variety of projects. This caused a huge strain as they only had 15 Sushas and it was impossible to supervise them without setting up bureaucratic system.

The issue they faced was that they were more disconnected with the outside world than before. The plethora of projects led to the appointment of inexperienced Sushas who had narrow expertise. The 90s saw a disruption of the system brought about by the system itself. To tackle this the initial project functions were sent to the lower levels. A better suited overall system was implemented. Partnerships were the main focus as only they had enough man power and resources to handle such huge tasks. The importance to just quality, time and cost was not enough for the new century. Only changes to the upstream could now make an impact. The research divisions now worked in close quarters with the management team. The result of this was not a car that could be put in market but rather a concept that could be tested. Intramanufacturer partnerships were the only way to handle the plethora of tasks at hand. The combined strength of a joint strength to tackle the problem. However, this was accompanied with the risks of misunderstanding were just as high. The partners had to be treated equally and the opinions of both sides mattered. A global platform had to be brought about which would reduce R&D expenses while at the same time making it possible to use the platform with a wide range of vehicle segments. This significantly reduced the time for the product to reach the market. As the scope of projects became bigger, the boundaries between OEMs and suppliers became thinner. The auto industry had come so far that codevelopment was the only way forward. An open architectural platform was introduced to make more versatile yet cheaper parts. Review 

The deadline is too short to read someone else's essay
Hire a verified expert to write you a 100% Plagiarism-Free paper
WRITE MY ESSAY
Papersowl
4.7/5
Sitejabber
4.7/5
Reviews.io
4.9/5

Cite this page

A New Way Of Project Management. (2022, Jun 27). Retrieved from https://papersowl.com/examples/a-new-way-of-project-management/